Robert Cruz, newly appointed Shop Manager of ABC Steel Company, was making his way through the plant back to his office. He had just reviewed the company’s most recent operating statistics with his boss, Rudyard de los Santos, Operations Manager. The statistics were shocking: ABC Company’s production backlog had reached such proportions that top management decided not to accept any further business. The company was paying penalties of P50, 000.00 a day due to non-fulfillment of contract delivery dates. ABC Company was one of the country’s largest producers of fabricated steel products. The company fabricated and installed storage tanks, mine and cane car bodies, dump bodies, boats and many types of structural steel. As shown in the organization chart (Exhibit 1), fabrication and installation activities were organized as independent activities. See more: Is the Importance of being earnest a satirical play essay Robert Cruz had recently been promoted from Quality Control Supervisor to Shop Manager (see Exhibit 1). Twenty-nine years old, Robert had worked for ABC Company for the past 2 years. He had previously worked as a sheet metal worker and as an instructor at a United States naval base in Subic. Robert held an engineering degree from a local university. Plagued by an ever-increasing production backlog, ABC Company had placed Robert in charge of all shop operations. There were 200 workers in the shop reporting directly to leadmen who, in turn, reported to Bay supervisors.1There were five Bay supervisors reporting to Robert. Before Robert’s appointment, Jim Fuentes, 45, was in charge of the shop. It was decided to transfer him to the position of Field Manager. (This position had formerly been a part of Rudyard’s responsibility.) Before, he and Mr. de los Santos had reviewed the ABC Company’s performance. Robert had isolated a number of critical problem areas in the fabrication shop. Production control was a constant problem. Schedules were drawn up improperly and they were seldom met. For example, a local construction firm had recently contracted ABC Company to build 2 dump trucks. The contract  price agreed upon was P150,000 each, and the trucks were to be delivered in 8 weeks. ABC Company had failed to meet the delivery date. The first dump truck was delivered after 10 week’s time, and the production statistics revealed that â€Å"out of pocket† costs for the first truck exceeded P170, 000. The second truck had yet to be delivered, and Robert estimated that fabrication costs for the two would total nearly P400,000. It was discovered that labor and material estimates had been inaccurate. More importantly, Robert listed four reasons why target dates were not met: (1) the targets were unrealistic, (2) shifts in manpower requirements were not anticipated, _______________ 1All fabrication activities were carried on in separate sections of the plant called â€Å"bays†. Most work orders were started and completed in one bay; less than 20% of the production work flowed from one bay to another. (3 there were no consistent â€Å"follow-up† policies and (4) machine scheduling was so poor that during one week, a huge cutting machine lay idle, while during the next week it had to be run 22 hours a day.2 As shown in Exhibit 1, Rudyard de los Santos was acting Production Control Manager. He and Gabby Alcantara, (Shop Production Control Supervisor), were working on a more effective system of production control. But Robert believed it would be at least six months before any new system would be ready for implementation. As the General Manager admitted, production and control was a â€Å"hit and miss† affair. Another problem Robert Cruz inherited when he took over the fabrication shop was a shortage of skilled manpower. ABC Company had long prided itself on being a producer of top quality steel products. The use of skilled welders, cutters, and steel workers was ABC Company’s only assurance that this quality could be maintained, and in recent years such skilled workers had become scarce. Finally, Robert had been told that there were serious â€Å"discipline† problems  in the shop. Workers were often tardy. They fraternized constantly during working hours, and often disregarded the authority of their leadmen and supervisors. Ninety percent of the laborers came from a nearby baranggay, and many were also baranggay leaders tended to be more lax in implementing company policies and taking disciplinary action against the workers. Other baranggay leaders who did not hold positions of responsibility with ABC Company were able to undermine the authority of the leadmen and supervisors in the shop. Two of the five Bay supervisors were described by the workers as â€Å"baranggay leaders†; two were described as being â€Å"not important† in the baranggay. One supervisor was an â€Å"outsider† and did not reside in the nearby baranggay. When Robert’s appointment to the position of Shop Manager became known, many persons in the shop were surprised. Although his performance in the Quality Control Department had been excellent, many of the â€Å"old timers† in the shop believed he lacked sufficient â€Å"management experience.† Interview with Robert Cruz Edison Mojica, an MBA student specializing in Organizational Behavior, had been observing the operations of ABC Steel Company as part of practicum for a number of weeks. He was waiting in the Shop manager’s office when Robert Cruz returned from his meeting with Rudyard de los Santos. He and Robert sat down and the new Shop Manager began to talk. Robert: Well I know I’ve got my work cut out for me†¦ You should see those penalty figures! We’ll be bankrupt in another five months at this rate! I’m still swimming in a pool of problems†¦Lots of them. Old problems dropped into my lap. _______________ 2ABC Steel Company fabrication operations were carried on during two eight-hour shifts. The first shift was from 8 AM to 5 PM; the second shift was from 5 PM to 2 AM. What’s worst, present problem multiply them (Pause). Of course, management does not expect me to solve these problems all by myself. I’m new in this position†¦.besides, the odds seem to be on my side. I would need the help of other departments. Edison: What do you mean by â€Å"odds†? Robert: Well, take the case of my supervisors in the shop. They are too old to be my subordinates. (Laughs) Not only that, they’re too good to their men. I don’t get any bad reports from them. That’s not an accurate reflection of things. The supervisors can’t afford to go against the majority’s rule you know how baranggay folks are†¦. Edison: But do you get results from your supervisors? Robert: It’s not a question of getting results from them. It’s more a problem of getting the best results. Do you think that my supervisors would have the guts to ask their men to cut out their chat-chats during working hours, or their coming late to work? Or even correcting their poor working habits? Everyone tries to be a supervisor here, you know. Edison: How do you propose to correct this situation? Robert: The Personnel Department will have to help me handle this problem. My supervisors and leadmen will be given supervisory training. If they still don’t’ learn†¦ Well, I think I have to be more firmed with them. Right? You see, before I stepped into this shop, these supervisors had been doing the things they’re doing now for generations. I’m not exaggerating. I think previous management had been too lax with them. To break a rule was not uncommon. Nobody seemed to check on anyone. Now when I came in, I tried to push these rules. What happened? The workers thought that I’ve created new rules for them. They think I’m trying to be strict with them. Edison: What’s your major problem in the shop? Robert: I have many major problems. (Laughs) But I think production control is the worst of them. We never seem to have completed any job on time. This is what’s costing us money. Planning and scheduling are a hit and miss affair. It’s really hard to break a habit, isn’t it? Besides, our production control section is undermanned, I think. What we‘ve got to do is get the men to think in terms of a schedule, a plan †¦.rather than just working on the job in front of them†¦.. The Problem of Overtime The following day a Bay Supervisor entered Robert’s office and requested that the entire fabrication work force be placed on overtime that weekend to complete a number of unfinished jobs.3 The Shop Manager knew that in recent months overtime expenses were extraordinarily high. Mr. de los Santos and top management had tolerated this extra expense because it seemed to be the only way to meet deadlines. Before granting the Bay Supervisor’s request, Robert asked for detailed description of the operations that were to be completed during the overtime period. The Bay Supervisor became angry. He stood up and exclaimed loudly. â€Å"Nobody in my twenty years in this shop has demanded this from me. Who do you think you are?† The two men stared at each other. After a few moments Robert suggested they review the matter with Mr. Rudyard de los Santos. The Operations Manger, sensing that the Bay Supervisor was very upset, decided that the Supervisor on this occasion need not submit a description of work to be completed. However, it was made an operating procedure from that time on that a proposed overtime activities list had to be submitted before any overtime could be allowed in the shop. The following week Robert found that it would be necessary for one of the fabrication bays to work overtime. He approached the Bay Supervisor and asked him to work overtime on the following day. To Robert’s surprise, the  Supervisor told him that the men could not make the overtime because they all had â€Å"previous appointments.† ABC STEEL COMPANY Essay VIEWPOINT:a) Mr. Robert Cruz, newly appointed Shop Manager of ABC Steel Company. The company had placed Mr. Robert in charge of all shop operations; OR b) Top Management TIME CONTEXT:At present I.PROBLEM STATEMENT: How can ABC Steel Company avoid delays in the production and delivery of the products to the customer? II.STATEMENT OF THE OBJECTIVE To strictly comply with the stated delivery schedule requirement of the customer in recently placed orders and fully accomplish the backlogs within three (3) months. III.AREAS OF CONSIDERATION A.STRENGTH 1.ABC Company was one of the country’s largest producers of fabricated steel products. The company fabricated and installed storage tanks, mine and cane car bodies, dump bodies, boats and many types of structural steel. 2. ABC has the capability to produce top quality steel products. B.WEAKNESSES 1.ABC Company has an inaccurate labor and materials estimates; 2.The targets were unrealistic; 3.Shifts in manpower requirements were not anticipated; 4.There were no consistent â€Å"follow-up† policies; 5.Poor planning and scheduling of manpower and machineries; 6.Shortage of skilled manpower that produces top quality products; 7.View of subordinates that Mr. Rober Cruz lacked management experience; 8.Authority of leadmen and supervisors is being disregarded by their subordinates; 9.Discipline problems among workers; and 10.Lax in the implementation of company’s rules and regulations. 11.Production backlog C.OPPORTUNITIES 1.ABC’s known credibility in producing high quality fabricated steel products can still be used to generate other leading consumers in the market. D.THREATS 1.Bankruptcy in another five months; 2.Industry’s awareness of ABC’s situation/inefficiency; 3.Decrease in customer loyalty 4.Other companies in the same product line that target the delivery schedule of its customers IV.ASSUMPTION/S A.The machineries used by the company are in good condition and are sufficient enough to meet production requirements. B.No price increase in commodities. C.Workers will coordinate with their supervisor in terms of work attitudes V.ALTERNATIVE COURSES OF ACTION A.Conduct meeting with Department Heads B.Resources and personnel maximization C.Sub-contracting VI.ANALYSIS ADVANTAGEDISADVANTAGE Better understanding of company’s situation Pin-point the source of the problem thru representations of the Heads in their respective departments. Encourage participation of concerned personnel in decision-making Time consuming Adjustment difficulty Avoid idle times of machines Avoid fraternizing during work hours Completion of backlogs/increased in production Higher cost for maintenance and utilities Acquiring the services of company with expertise on the goods / services required. Division of labor Less profit VII.CONCLUSION AREA’SACA ABC Adaptability332 Timeliness332 Cost Effectiveness321 Manageability332 Total12117 Legend: 1 – Good, 2 – Better; and 3 – Best VIII.RECOMMENDATION:ACA A IX.DETAILED PLAN OF ACTION ACTIVITIESPERSONS INVOLVEDRESOURCESTIME FRAME 1.Conduct management review meetingRudyard delos Santos and Department HeadsMeeting expenses-Weekly (until the completion of the backlogs); and -Once every months (routine schedule). 2. Strict implementation of management review meeting agreements (e.g. Status reports)Department HeadsMeeting expensesAs required. 2. Conduct Leadership trainings and seminar for Completed Staff Work Managers and StaffAt least 2 training per semester (1 internal and 1 external trainings) 3.Creative an incentive scheme (e.g. Star Performer of the month) with incentive bonus StaffEvery month 4. Create a Performance Evaluation CommitteeManagers/SupervisorsBefore end of the year 5.Conduct of Team Building activitiesManagers, Staff, Department headsCultural expenseQuarterly – all department

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.